What to Expect During the Pool Building Process—Start to Finish

When you’re ready to build your dream backyard oasis, knowing what happens during the pool building process helps reduce stress, avoid surprises, and keep everything moving smoothly. At H30 Pools & Exteriors, we walk DFW homeowners through every step—from concept to completion—so you can enjoy your new pool with total confidence.

Here’s a detailed look at what to expect from the first consultation to the day you take your first swim.

Step 1: Design, Planning & Budgeting

The process starts with an in-depth consultation to understand your lifestyle, space, and goals. We discuss pool shape, size, materials, features, and layout. Whether you’re interested in a classic rectangular pool or something more custom, this is where we align your vision with your budget.

You’ll choose between chlorine or saltwater, add-ons like tanning ledges or fire features, and explore options for decking and landscaping. Our new pool construction service includes 3D design renderings so you can visualize the final result before we break ground.

A good design stage also includes reviewing long-term maintenance needs and energy-efficient equipment. It sets the tone for a streamlined build.

Step 2: Permits, Engineering & Site Preparation

Once your design is finalized, we handle the permitting process, HOA approvals, and site prep. In DFW, this can take anywhere from a few days to several weeks depending on local regulations.

We coordinate soil tests if needed, check utility lines, and begin clearing and grading the backyard to make room for your pool. This ensures safe digging and prepares the site for excavation.

You’ll also receive a projected timeline and construction schedule—so you always know what’s next.

Step 3: Excavation & Structural Construction

This is when your backyard starts to transform. Excavation teams dig the pool cavity based on your design specifications. Then we install the steel reinforcement grid and plumbing lines, followed by the concrete shell (shotcrete or gunite).

If you chose a fiberglass pool, this is when the pre-formed shell is placed into the ground.

It’s normal for your yard to look messy at this point, but this foundational step is critical to the strength and longevity of your pool.

Step 4: Equipment & Systems Installation

Next, we install the mechanical systems that power your pool:

  • Filtration system
  • Pumps and valves
  • Heaters or heat pumps
  • Electrical wiring and lighting
  • Sanitation (chlorine or saltwater)

This is a good time to consider adding smart automation systems or water-saving technology. If you’re unsure whether salt or chlorine is right for your pool, check out our article on Saltwater vs Chlorine Pools to weigh your options.

All electrical and plumbing work is completed by licensed professionals to meet code and ensure efficiency.

Step 5: Tile, Coping, Decking & Features

With the structure and systems in place, your pool starts to take shape visually. We install waterline tile, coping (the material along the pool’s edge), and your chosen decking—whether that’s stamped concrete, pavers, or natural stone.

This is also when we add custom features like:

  • Tanning ledges
  • Waterfalls or spillways
  • Fire bowls
  • Outdoor kitchens or pergolas

If your pool is part of a larger backyard makeover, our outdoor living services integrate everything seamlessly for a cohesive design.

Step 6: Interior Finish, Fill & Start-Up

To complete the interior, we apply a finish—typically plaster, pebble, or quartz—based on your style and durability preferences. Once cured, we fill the pool with water and begin start-up.

This includes:

  • Chemical balancing
  • Filter testing
  • Pump and heater activation
  • Salt system or chlorine initiation
  • Initial brushing and water circulation

At this point, your pool is nearly ready for use, and the final inspection will follow shortly after.

Step 7: Final Walkthrough & Pool School

Before you take your first dip, we walk you through the entire system: how to test your water, adjust chemicals, clean filters, and use automation features. We call this “Pool School,” and it’s a must-have part of the pool building process to ensure long-term success.

Once everything passes inspection, your pool is officially complete!

Project Timeline & Considerations

Several factors affect your project timeline:

  • Type of pool (gunite vs fiberglass)
  • Custom features and outdoor additions
  • Permit and HOA delays
  • Weather conditions (especially rain)
  • Seasonal scheduling

Typically, the pool building process in North Texas takes 8–12 weeks from excavation to completion, though more complex builds can extend that timeline.

If you’re building during winter or early spring, you may also benefit from faster permit approvals and fewer weather delays. For more on construction best practices, this homeowner’s guide breaks down every phase in detail.

Get the help you need to build the pool you’ve been dreaming of. At H30 Pools & Exteriors, we guide homeowners through every stage of the pool building process, ensuring you’re informed, excited, and supported every step of the way. From design and excavation to equipment, finishing, and final swim—we build for your lifestyle, your backyard, and your budget. Reach out today and let’s get started.

What to Expect During the Pool Building Process

Get Help from Our Pool
& Outdoor Sales Team

What can we help you with?

Let's Discuss Your Pool or Outdoor Living Project

If you're looking for a new pool design, installation, repair, or maintenance then you're in the right place for our experienced pool services. You might also be looking for outdoor patio design, building, and renovations that we also specialize in. No matter your home outdoor project, we want to be a part of it!

Contact Us

5512 Surry Mountain Trail
Fort Worth, TX 76179

Email: info@h30pools.com

Phone: (682) 409-9372

Copyright © 2025. H30 Pools and Exteriors. All rights reserved. | Web Design & Digital Marketing by Nickel SEO